On 21 May this year India's peak electricity demand touched 270 GW, the fourth consecutive all-time high. In 2019 the peak was around 180 GW. That is roughly 90 GW of new peak demand in seven years, about the size of France's entire winter peak.
Three weeks earlier, on the evening of 30 April, one of our FlexiPods in Delhi recorded grid voltage swinging between roughly 200 and 230 volts over a 90-minute window. The AC was running. The lights were on. Nobody in that building experienced a power cut, and nothing in the national statistics registered anything at all.
Both are accurate descriptions of the Indian grid. We spend almost all of our attention on the first one. The 2026 night peak of 247 GW matters even more for storage, because it occurs at hours when solar contributes nothing.
Five weeks of second-by-second data.
Between 4 April and 11 May we logged grid-side voltage continuously, at roughly one-second resolution, at a live deployment. It was not a study. The system does this anyway, because it has to know what the grid is doing to decide what to do with the battery.
Scope: one site, one building, five weeks. Not a national survey. But continuous, second-by-second data from below 11 kV, which is rare.
For the first two weeks, voltage sat between 240 and 255 volts. That is not healthy either: India's permitted band for low-voltage supply is 230 V plus or minus 6%, roughly 216 to 244 V, so the meter spent early April at or above the upper limit. From around 19 April it swung the other way. Dips got deeper. Events below 210 volts began appearing regularly after 6 PM.
The relationship with demand was not subtle. Plot grid voltage against local demand across thousands of measurements and you get a clean regression line. At near-zero demand, voltage sits above 235 V. As the building's draw approaches 10,000 to 12,000 W in the evening, it falls to 200 to 205 V. For a network nominally rated at 230 V, that is not a rounding error.
One caveat we owe the engineers reading this: this is the load at our own meter, so part of that drop sits in the building's internal wiring, and the neighbours' load peaks at the same hours. Separating the two needs a second measurement point on the same transformer.
Plot minimum voltage by hour of day and the pattern is plain. Early April is mostly green across all hours. By May, red dominates the 6 PM to 9 PM columns. More dates, more hours, more stress, all concentrated in the same three-hour window every evening.
Source: TEC FlexiPod field telemetry, New Delhi deployment, 4 April to 11 May 2026.
What this costs, and why nobody bills you for it.
Here is the awkward part about voltage sag. Nothing stops. Your fridge keeps running. Your AC keeps cooling, more or less. You do not get a message from anyone.
Underneath that, the compressor is drawing higher current to deliver the same cooling, running hotter than it was designed to, and quietly shortening its own life. Pumps and motors lose efficiency. Sensitive electronics fail more often. All of it accumulates across every appliance sharing that transformer pocket, and the consumer pays for it in equipment that wears out sooner than it should, for reasons nobody ever explains.
There is no line item for this. There is no complaint mechanism, because there is nothing visible to complain about. You cannot file a grievance about electricity that arrived.
So we are solving it. At the wrong voltage level.
India's response to grid stress has been serious and mostly sensible, and it has been aimed almost entirely at the top of the system.
CEA has mandated grid-forming inverters on upcoming battery storage: stable operation at a short circuit ratio of 2.0 or below, response within 5 milliseconds, full response within 30, and short-term overload of at least 1.5 per unit for 200 milliseconds. The near-miss record justifies it: 68 events above a gigawatt of variable renewable generation lost between January 2022 and July 2025, and Pavagada in 2023 cascading into over 1,500 MW gone in seconds, with southern frequency down to about 49.85 Hz.
Grid-scale BESS tenders are running at scale. Transmission is being built. States are mandating storage alongside solar. All of that is correct, and none of it will do anything about the 205 volts at that meter in Delhi at 7:30 PM.
Voltage drop in the last stretch of an LT network is a local problem with local physics: current through the resistance of the cable between your distribution transformer and your building. A 250 MW asset four hundred kilometres away, behind two transformer stages, cannot hold up the voltage in your feeder pocket. It is not that it responds too slowly. It is not electrically present where the problem is.
You can add thirty gigawatt-hours of grid-scale storage and the compressor in that Delhi flat will still run at 205 volts. It was never short of generation. It was short of voltage support in the last two hundred metres.
The instrumentation is already going in. It belongs to somebody else.
Instrumentation follows money, and India's grid is heavily instrumented above 11 kV and almost blind below it. Smart meters are rolling out at real scale and they are useful for billing, consumption tracking, remote disconnect and utility-side accounting. Many can log voltage, but they were never designed as a consumer-side power quality layer, and in practice that data rarely reaches distribution planning. A DISCOM planner deciding which transformers to upgrade this year works from complaint volumes and load estimates, because continuous voltage telemetry at transformer resolution across a city does not exist.
Here is what we did not expect when we started this company. Every FlexiPod watches grid-side voltage continuously, because it needs that data to manage charge cycles and protect the battery. That was a means to an end. It turns out to be the more interesting output.
Each deployment is a sensing node inside a distribution pocket: not at city level, not at the substation, but at the transformer. India added over 7 GW of rooftop solar in 2025 alone, on top of a growing fleet of batteries and inverters, and almost all of it operates blind. It experiences the grid intimately and reports it to nobody.
Made visible, that installed base is a distribution-grid observability layer no utility budget could buy outright, because the assets are already being bought by somebody else for their own reasons.
Cooling now drives a large share of peak summer load in big Indian cities, and the demand curve has changed shape. It used to spike and fall. Now it plateaus from sunset past midnight. On 24 May India hit 247.9 GW at 10:36 PM, when solar contributes nothing, in the same evening stretch in which our data shows voltage collapsing.
India's next grid problem is not a shortage of electricity. It is electricity that arrives in poor condition, at the same time every evening, to people who have no way of knowing it is happening.